Skip to content

Trello from Scratch: Your First Board, Lists and Cards

One board, three lists, cards with dates and labels, and the first Butler rule. The smallest setup that survives a real working week.

Trello looks like a simple tool until you try to organise your own work in it. Boards, lists, cards and a handful of settings that are not obvious at first glance. This article takes you through the first half-hour: from an empty board to a card with a due date, label, attachment and first automation. Everything is on a demo account, so you can follow along without risk.

Would you rather watch than read? I show the full Trello tour in a video:

What a board, list and card are

Trello has three levels, and it is worth distinguishing between them before you start clicking. A board is one project or one area of work. A list is a stage of work within a board. A card is a single task that moves between stages.

This division is enough as long as there are a dozen or so tasks and one person can keep track of everything. It starts to get in the way when tasks have many levels of dependencies, you need to track work time or you need several views of the same data. At that point, it is better to use a tool with dependencies and a Gantt chart. For tracking stages and who is doing what, a board with lists is still enough.

Your first board: name, background, visibility

After logging in, choose Create, then Board. Give it a name that says what it is about, for example Demo W01. A short name with a number works better than a description of the whole project, because it fits on the bar and is not cut off on a phone.

Change the background from the board menu, under Background. Choose something understated if the board is for work rather than a presentation. Set visibility next to it, in the Visibility section. Private means that only invited people can see it. In a Workspace, it can also be visible to all its members.

The demo account has a board set against a city photo, with a “14 days remaining” banner visible. This is the trial period for the paid plan that Trello enables at the start. The board and list views work in exactly the same way on the free plan. The differences only appear in the limits described below.

Demo W01 board with three lists and cards. A card count appears next to each list name, and the Room inventory card has due date and checklist badges.
Demo W01 board with three lists and cards. A card count appears next to each list name, and the Room inventory card has due date and checklist badges.

Lists: create, rename, reorder

Add a list with the Add another list button on the right-hand side of the board. Name it after the stage, not the person: To do, In progress, Done. People’s names change faster than the process, and a list assigned to a person stops meaning anything after the first holiday. The Demo W01 board has exactly three such lists, each with a card count next to its name.

Rename a list by clicking its name and choosing the pencil, or by using the list menu. Set the order by dragging the whole list left or right. It is worth keeping lists in process order, because then dragging a card to the right always means the same thing: the task is moving forward.

Cards: title, description, checklist, due date, labels, attachment

Add a card with the Add a card button under the list you choose. Enter a title in the imperative, for example, Room inventory, and press Enter. Only then open the card and fill in the details, because the title is the only field that needs to be ready straight away.

The description is for the scope and arrangements. The demo card has the building address, information about two levels and 24 rooms, and a list of data to collect: number, function, area, number of electrical points and ventilation points. This is enough to complete the task without asking the author for more information.

A checklist is where you put steps to tick off. Add it with the Checklist button, enter a name and then add the items. The progress bar shows how much is left. In the example, the checklist is called Inventory scope, has four items and two are ticked off, so it shows 50 per cent.

Set a due date with the Dates button. You can enter a date on its own or a date and time, as on the demo card, which shows a due date of 28 October at 16:44. After saving, the due date appears on the card as a badge. Once the date has passed, it changes colour and is marked Overdue. This is the simplest way to spot a delay without opening the card.

Labels organise cards horizontally, across lists. By default, you get six colours and none has a name until you give it one. On the Demo W01 board, the inventory card has two labels, red and blue, but they are still just colours. Naming them is the first thing worth doing after creating a board, because a colour without a name only means whatever someone happens to remember.

Add an attachment with the Attachment button. You can upload a file from your drive or provide a link. The room inventory card has a CSV room schedule (zestawienie-pomieszczen.csv) attached, so whoever takes over the task has the input data straight away and does not have to reconstruct it from the description.

Open Room inventory card. From the top: two labels, due date of 28 October at 16:44, description with the scope, zestawienie-pomieszczen.csv attachment and Inventory scope checklist at 50 per cent complete.
Open Room inventory card. From the top: two labels, due date of 28 October at 16:44, description with the scope, zestawienie-pomieszczen.csv attachment and Inventory scope checklist at 50 per cent complete.

Labels and filtering by label

After assigning labels, it is worth using them to narrow the view. On the board, press F or choose Filter. The panel has sections for keyword, members, Card status, due date and labels. One section, Card status, has an English name because the Polish interface translation is not complete yet.

The filter does not change anything on the cards, so you can switch it on and off while working without worrying about the data. It is a good tool when you want to see only cards with one label or only overdue tasks.

Labels window opened from a card. Selected colours have already been assigned to the card, and the Create new label button lets you add another.
Labels window opened from a card. Selected colours have already been assigned to the card, and the Create new label button lets you add another.
Filter panel opened with the F key. Sections: keyword, members, Card status, due date and labels. The filter changes only the view, not the cards themselves.
Filter panel opened with the F key. Sections: keyword, members, Card status, due date and labels. The filter changes only the view, not the cards themselves.

Moving cards between lists

Grab the card by its centre and drag it over another list. Trello will show where it will be placed, and the card will change lists when you release it. On a touchscreen, press and hold the card until it lifts, then drag it sideways.

If dragging is awkward, open the card and change the list in the field above the title. The result is the same, and you can see the whole card at the same time. After moving it to Done, the card stays on the board. Archive it only when it is genuinely no longer needed, because the Done list is also proof that something has been done.

Collaboration: member, comment, watching

Start an invitation with the Share button in the board header. Enter the person’s address, choose a role and send the invitation. The invited person has to accept it before they can see the board. The panel also has a Join requests tab and a Create link button, which grants access without sending an invitation.

Share board panel. Email address field, role list, board link and the Board members and Join requests tabs.
Share board panel. Email address field, role list, board link and the Board members and Join requests tabs.

Add a comment on a card in the Write a comment field. Mention someone with an at sign and their username, and they will get a notification. Comments stay in the card history together with information about who added them and when, so the card itself records what happened to it.

Watching a card works like a subscription. The eye icon on a card turns on notifications about every change. When there are dozens of cards, it is better to watch only the ones you really care about. Otherwise, notifications stop meaning anything.

Butler automation: one rule to start with

Butler is the board’s built-in automation. Go to Automation and choose Rules. The panel shows ready-made examples in this form: when something happens on the board, perform an action. One example says: when another person moves a card to the Done list, mark the due date as complete and remove all members from the card. Another says: when I am added to a card, set the due date to 5 working days and post a comment.

Create your own rule with the Create automation button. Each rule has two parts: a trigger, meaning an event on the board, and an action, meaning what should happen. The builder labels are in English because this screen has not yet been translated into Polish, but the logic is the same. The simplest rule that is useful from day one is: when a card moves to the Done list, add a due date to it. That way, the Done list has dates, and you can see when tasks were actually completed.

Rules panel with ready-made examples. Each example follows the pattern: when something happens on the board, perform an action. This is the same structure you will use for your own rule.
Rules panel with ready-made examples. Each example follows the pattern: when something happens on the board, perform an action. This is the same structure you will use for your own rule.

Start with one rule and check that it works. Only then add more. Too many automations on one board are hard to trace later, and the effects can be surprising, especially when two rules change the same field.

Free plan limits

The free plan is genuinely useful in Trello, but its limits are defined. Checked on the pricing page on the day this article was written, under FREE:

  • Up to 10 boards in one Workspace (Up to 10 boards per Workspace)
  • Up to 10 collaborators in a Workspace (Free for up to 10 collaborators per Workspace)
  • 250 automation runs per month per Workspace (250 Workspace command runs per month)
  • Unlimited cards
  • Unlimited Power-Ups per board
  • Unlimited activity history
  • Files up to 10 MB

For comparison, paid plans are priced per user per month with annual billing. Standard is 5 USD (6 USD with monthly billing): it removes the board limit, raises the file limit to 250 MB and increases automation runs to 1000 per month. Premium is 10 USD (12.50 USD per month) and adds calendar, timeline and table views, as well as unlimited automation runs. Enterprise is 17.50 USD per user with annual billing.

Trello pricing page. The FREE column shows a price of 0 USD, a limit of 10 collaborators, 10 boards, 250 automation runs per month and files up to 10 MB. Prices for Standard, Premium and Enterprise are next to it.
Trello pricing page. The FREE column shows a price of 0 USD, a limit of 10 collaborators, 10 boards, 250 automation runs per month and files up to 10 MB. Prices for Standard, Premium and Enterprise are next to it.

The practical conclusion: as long as you work alone or in a small team and do not need views or custom fields, the free plan is enough. A paid plan starts to make sense when you run out of boards or automation runs, not when you lack decorative features.

What next

You have a board, three lists, cards with due dates and labels, and your first rule. That is enough to get started. You can refine the rest as you work.

Related material: [Project management software], [ClickUp: project management] and [The best tools for engineers].

Check also:

This article was created with the help of artificial intelligence.

Paweł Kińczyk
Paweł Kińczyk
Articles: 189

Newsletter

Chcesz być na bieżąco? Zapisz się do newslettera!

Leave a Reply

Your email address will not be published. Required fields are marked *