Notion from Scratch: Your First Page and Task Database

A page, a task database with five properties and three views of the same data. The first half hour in Notion without a template you will never use.

Notion looks harmless until you click the plus next to an empty line. Then you realise it is not a text editor: every line is a separate block, and a database is an ordinary page with properties. Five minutes of clicking can leave you lost; five weeks later, you may not remember where you entered a task.

This guide takes you from an empty workspace to a working task database. I use one account in the live app and real screenshots. The interface is in English, so the button names are English while the note is in Polish, as in companies where some people use the English version.

I will show you:

  • the difference between a workspace, page and block,
  • how to build a page with headings, a list, a callout and a toggle,
  • how to turn a bullet list into a task database with properties,
  • how to view the same data as a table, board and calendar,
  • how to filter the view to show only my tasks,
  • what the free plan gives you and where its limits are.

For a broader overview, I compare project management software in a separate post, showing how Trello, Asana, Nozbe and Notion differ in practice. This is a guide to one of them.

Workspace, page and block: three levels to distinguish

After sign-in, you land in a workspace. Mine, Hermes’s Space, has a Private section on the left, visible only to its owner. Companies have teamspaces instead, with separate permissions. This determines who can see your notes.

A page is a document opened from the left-hand list. It has a title and an unlimited list of blocks. Each block is one line with a type: paragraph, heading, bullet point, callout, toggle, image or database. A heading is a separate block, not a bold paragraph, so it appears in the table of contents and Notion search.

The quickest way to work is with shortcuts at the start of an empty line. Two hash signs and a space create a second-level heading; a hyphen and a space, a bulleted list; a greater-than sign and a space, a toggle. A slash opens the block menu, so you need not remember block names.

Screenshot of the Demo W76 page in Notion, with a title, callout block and section headings
Demo W76 after a few minutes of work. Below the title is a bordered callout, then three second-level headings and paragraphs. Each block has a handle in the left margin for moving it elsewhere.

First page: headings, list, callout and toggle

I start with a blank page called Demo W76. The order matters: it makes the page read like a note, not disconnected sentences.

  • In Private, click New page and enter a title.
  • Type /callout and add one sentence explaining the note. Its background and icon make it an introductory frame.
  • Add second-level headings with /h2 or two hash signs and a space. Mine are How to read the note, The project we are practising, and Rules that keep things organised.
  • Under Rules, type a hyphen and a space for a bulleted list. Three points fit on one screen.
  • End the section with a toggle, using a greater-than sign and a space. Put anything that clutters the main text inside, such as keyboard shortcuts.

The toggle teaches you to think of a page in layers. Hide anything that does not need to be visible straight away to keep the page short. I put an explanation of what to do when a page grows inside mine: it is for later, not for the first read.

Screenshot of a bulleted list, collapsed toggle block and the Task database heading
A bulleted list, collapsed toggle and the start of the database section. The triangle points right when the toggle’s contents are hidden. The Task database heading is already below the list, because a page and database are one document, not two.

One editorial rule I follow on every page: one page, one topic. If a second thread comes up, I create a separate page and link to it, rather than turning this page into an archive of everything.

Task database: table and five properties

Under Task database, I type /table to insert a database in table view. Notion calls it a database, but it works like a spreadsheet: each row is a page and each column a typed property.

I keep Name as the title and add four properties: Status (status type, with To do, In progress and Done options), Person (person), Due date (date), and Priority (select, with High, Medium and Low options). The type matters: it determines filters, colours and whether the calendar can use the column.

To enter data, fill a cell and press Tab to move to the next property. My database has six tasks from a real office inventory project: inventory the rooms, export floor plans to PDF, compile the electrical point schedule, check ventilation, photograph existing conditions and write up the client meeting notes.

Now the difference between a bullet list and a database is clear. A list shows tasks in one order; a database lets you sort, filter and group them without rewriting text. The same six tasks can be a table for data entry, a board for team work or a calendar for dates.

Screenshot of the Notion task database in table view, with Status, Person, Due date and Priority columns
The task database in table view, with Name, Status, Person, Due date and Priority columns. Select values are coloured for quick recognition: Done is green, In progress blue and To do yellow. Dates use English format because the account interface is English.

Three views of the same database

Tabs above the database show its views. Table, Board and Calendar are three ways to see the same rows, not separate databases. Each view keeps its own column order, grouping, filters and sorting. Changes in one view do not affect others unless you change the data.

Board groups rows by a property. Mine is grouped by person, giving three columns, Marta, Paweł and Tomek, with two cards each. This quickly shows who has how much work. Change the grouping in view settings by choosing another property, such as Status.

Screenshot of the task database in board view, with columns for Marta, Paweł and Tomek
Board view grouped by person, with three name columns and two cards in each. Cards currently show only task names; other properties are hidden in view settings. Show them if the board is for the team, not just you.

Calendar needs a date property, or the view will be empty. My Due date column was enough for Notion to place the tasks across October. This view often convinces people working on several projects at once, because it reveals deadline clashes hidden in the table.

Screenshot of the task database in calendar view, with tasks arranged across the days in October
Calendar view based on Due date. It shows October 2026, with tasks across the coming days. Names are truncated because the day column is narrow, but hovering over a card reveals the full title.

A fourth view, which did not fit in my tab bar, is under 1 more. Databases with several views work this way: the bar has limited width, so the rest are in a drop-down menu. It is ordinary overflow, not an error.

Filter and sort: only my tasks for today

A filter determines which rows you see. Click Filter above the table, then choose a property, operator and value. Mine is Person is Paweł. I also sort by Due date, ascending, to put the nearest tasks first.

The six rows immediately become two, both mine, ordered by deadline. The rest of the team remains in the database but does not match the filter. The same works for any property, including dates; for a view of today, choose Due date, a date operator and the range is today.

Best practice is not to filter a view used by the whole team. Add a view called My tasks for today and keep your filter there. The main table stays complete, and your view is close at hand. My database has four views: table for data entry, board for assigning work, calendar for dates and filter for the daily review.

Screenshot of the task database filtered to Person is Paweł and sorted by due date, with two visible rows
My tasks for today, filtered by person and sorted by due date. Two blue chips sit above the table: sort by Due date and filter Person: Paweł. The remaining rows are Room inventory, dated 23 October, and Electrical point schedule, dated 27 October. Filtering leaves two of six rows; it does not delete data.

Sharing and permissions: link, comment, guest

The Share button at top right opens two tabs. Share invites people and sets page access; Publish makes the page a public website. They are easy to confuse because both sound like sharing.

In Share, enter an email and choose access. My account lists Hermes (You) with Full access, allowing editing and further invitations. General access is Only people invited, so outsiders need an invitation. One click grants access to the whole workspace or anyone with the link, often exposing notes.

Screenshot of the Notion sharing panel, with a people list, General access setting and Copy link button
Share panel on Demo W76, with an email field, people with access, General access set to Only people invited, and Advanced and Copy link buttons. Copy link gives you the page address to send to the team.

Comments are a third form of collaboration, separate from editing. Select text, click the comment icon and write a note; people with access see it beside the text. In a database, comments can be attached to an entire row, not just a cell, keeping decisions out of correspondence. A guest with comment-only access cannot change data, usually enough when working with a client.

Free plan limits

I copied all the figures below from the Notion pricing page on 22 October 2026, for monthly billing and the euro currency. Pricing changes every few months, so check it again before making a decision, because this is the only place where the figures are current.

ItemFreePlus
Price per person per month0 EUR9.50 EUR
Pages and blocksunlimited for one person, limited with two or more peopleunlimited
Uploaded filesup to 5 MBunlimited
Page history7 days30 days
External guests10unlimited
Charts in databases1unlimited
Notion AItrial periodtrial period

Three things in this comparison matter more than the rest. First, the file limit: 5 MB per file is less than most project PDF plans weigh, so on the free plan, project documentation quickly ends up in another tool. Second, page history: seven days means you cannot recover something someone accidentally deleted after a week. Third, guests: ten external people is a lot when you have one client, and very few when you have five.

The free plan is, however, fully sufficient for learning and working on your own. Databases, properties, views, filters and sorting work just like they do on paid plans, without a trial period. That is why it is worth spending the first week on the free plan: if you are still using the tool every day afterwards, deciding to pay is a decision, not a bet.

Where to start on Monday

The whole process in this post takes about forty minutes and ends with a database that really works. The order matters, because each step builds on the previous one: first the page, then blocks, then the database, and finally views and filters.

  • Create one page for one topic and put one sentence in a callout explaining what it is for.
  • Build the page with three headings and one list. No more, because a longer page at the start only delays a decision.
  • Add a database with four properties: status, person, due date and priority.
  • Add three views: a table for data entry, a board grouped by person and a calendar based on the due date.
  • Add a view filtered to show your own tasks and sorted by due date, so you see only your work in the morning.

After a week of work, return to this setup and check what is missing. Usually, you need to add one property, not ten new pages. This is the most common beginner’s mistake: people build a structure in advance, then forget where to enter things. A database with six rows and five columns is better than an elaborate system that nobody updates.

If it turns out along the way that Notion is not the tool for you, take a look at the project management software comparison, and if you are more interested in a knowledge base than tasks, read the comparison of Obsidian and Notion. The same block mechanism works in both, but they organise it differently.

Check also:

This article was created with the help of artificial intelligence.