Asana from Scratch: Project, Tasks and Views

A project, tasks and subtasks, then the same work seen as a list, a board, a calendar and a timeline. What the free plan really allows.

At first glance, Asana looks like a task list with a large number of buttons. In practice, it comes down to three concepts: workspace, project and task. Once you separate them, the rest of the interface stops being a mystery. This article takes you through your first half hour in the tool: from an empty workspace to a project with tasks, due dates and four views. All screenshots come from a real account, and the plan figures were read from the billing settings, not recalled from memory.

Would you rather watch than read? I show the full Asana walkthrough in this video:

What are a workspace, project and task

A workspace is your company or team, with members and a shared project list. The screenshot shows “My workspace” with one user, and Hermes and Demo W74 in the left panel.

A project is an undertaking with a goal, such as implementing a conceptual model for a client. It groups tasks and has its own views and members.

A task is the smallest unit of work: name, assignee, due date, description and project. A subtask sits inside a task. Use it to break a step into smaller ones without cluttering the main list.

Asana workspace home page
Workspace home page. Left panel: Work, Home, Inbox, My tasks, Projects and Portfolio. The Advanced plan trial appears at the bottom. Start your day here, but do not work on tasks here.

Project Demo W74: name, description and default view

Create a project with Create in the top-left corner. Asana offers templates; for your first try, choose a blank project. Name it for the work, not the tool. We used Demo W74 to distinguish training from real work.

Set the default view after creating the project. It opens for everyone who clicks the project. Ours is List, which shows the most information at a glance for tasks with due dates. Change views at top right, beside Overview, List, Board, Timeline and Dashboard.

Add a project description straight away. Two or three sentences on why it exists, who decides and where the scope is defined will save comment questions. Demo W74 says the scope is a conceptual model of a hall for a client, the work has three stages, and the client makes decisions. This makes clear what is outside the project.

Demo W74 project in list view
Demo W74 in list view, with Preparation, Design and Handover sections. The Assignee column shows a green Hermes avatar; Due date shows Monday (26 Oct), 29 Oct, 6 Nov, 3 Nov and 13 Nov. Each section ends with an “Add task” row.

Tasks and subtasks: assignee, due date, priority

Add a task in the “Add task” row under a section. Name it with a verb and outcome: “Create the conceptual model” says more than “model”. Press Enter to add it, then double-click to open details.

Set four things in the right-hand panel, in this order:

  • Assignee. Choose a workspace member. Without one, the task will not appear in anyone’s My tasks list.
  • Due date. Click to open the calendar, or type a date, for example 06.11.2026, and press Enter. It appears in the calendar and timeline.
  • Section. This sets list order and gives the board sensible columns.
  • Subtasks. Find this section near the bottom of the panel. Two or three per task is sensible; above ten, you will manage the list instead of working.

Priority is not built in. It is a custom field; our project panel says “No custom fields in this project”. Custom fields require a paid plan, so on the free plan use the task name, section or a tag instead. This is a plan limit, not a technical one, as explained below.

Task details panel in Asana
Task details, top to bottom: name, “Mark complete”, assignee, due date, Dependencies with “Add dependencies”, project and section, no-custom-fields notice, description, Subtasks and comment field. Assignee and date come first because they determine whether the task reaches anyone.

Views: list, board, calendar, timeline

The same tasks have several views, not separate projects. Choose one for the question you want answered.

List answers “What needs doing, and in what order?” Sections show stages; columns show assignee and due date. It is best for daily work and is our default.

Board uses columns and cards to answer “What stage is the work at?” Our columns are Preparation, Design and Handover. Drag a card right as a task progresses. Board works well in meetings because it shows work distribution, not a list of names.

Demo W74 project in board view
The same project in board view. Columns are project sections; cards are the same tasks as in the list. Preparation and Design have two cards each, Handover one, showing where most work sits.

Calendar places tasks on a grid of days and weeks, answering “When am I under pressure?” It only helps when tasks have due dates, which matter more than priority. Demo W74 has no Calendar tab in its default set (Overview, List, Board, Timeline and Dashboard), so the screenshots show Timeline. The manufacturer’s pricing page says Calendar is in the free plan.

Timeline is a Gantt view, with tasks as bars on a time scale. It answers “Will we finish on time, and what is waiting for what?” Timeline requires a paid plan. It works on this account because the Advanced trial is active. After the trial, the project returns to List, Board and Calendar.

Demo W74 project on the timeline
Project timeline. The task bars show November work overlapping. Look at their order over time, not their names. This view is for planning, not ticking off work.

My tasks and inbox: how not to lose your own commitments

A project is good for seeing the whole picture, but it does not answer the question, “What do I need to do today?” There are two items in the left panel for that.

My tasks collects everything assigned to you across the whole workspace, regardless of project. The first screenshot shows that the tasks from Demo W74 have landed there, with their due dates and project names next to the task names. This is the only place where you can see your own commitments in one list. It is worth checking it in the morning instead of opening individual projects.

Inbox contains notifications: comments, mentions, due-date changes and assignments. A rule that works: clear your inbox to zero once a day by turning items into tasks or closing them. The inbox is not a task list and should not become one.

The practical consequence: a task without an assignee will not appear in anyone’s “My tasks” list. This is the most common reason tasks disappear from view. Assigning a person matters more than adding another field.

Dependencies and milestones: what is in the free plan

In the task panel, we saw the Dependencies section with an “Add dependencies” option. This is a paid-plan feature, as are milestones, start dates, custom templates, forms, custom fields and dashboards. These items are visible in the account used for this article only because the Advanced plan trial is active.

On the free plan, you can replace a dependency with section order and due dates: give a task that must be finished earlier an earlier date, and write in its description what it is waiting for. It is less elegant than a dependency arrow, but it works and does not require payment.

Free plan limits

The account used for this article is not on the free plan. The billing panel shows: “Asana Advanced plan trial”, “14 days left in trial”. The trial ends on 4 November 2026, after which the account automatically moves to the free Asana Personal plan. This matters because some features visible in the screenshots will simply disappear.

The free Asana Personal plan, according to the manufacturer’s pricing page:

  • 2 users in a workspace,
  • unlimited tasks and projects,
  • list, board and calendar views,
  • unlimited storage with a 100 MB limit per file,
  • status updates and more than 100 free integrations.

The following remain outside the free plan: start dates, task dependencies, timeline and Gantt, milestones, custom templates, forms, custom fields, dashboards, private projects and unlimited guests. If you plan to work with subcontractors, count the people, because the limit of two users on the free plan is strict.

Asana billing panel and plan details
The workspace billing panel. It shows the plan name, “Asana Advanced plan trial”, the counter “14 days left in trial”, the AI Studio Basic item, time tracking cards to add during the trial and no billing details. What to look at: the plan name and the number of days. This is the only place where you can check which plan you are actually using.

Where to start on Monday

Organise your workspace: one project for each undertaking, with names that describe the outcome. Add three sections that correspond to stages, not departments. Add five tasks, assign each one to a person and set a due date, then open the board and calendar. For the first week, work in List and My tasks, because those two screens are enough to make sure nothing gets lost.

If you are choosing a tool now, take a look at the project management software comparison, where we compare Asana, Trello, Nozbe and Notion for everyday work, not just by feature list. Separate tutorials for Trello from scratch and Nozbe from scratch are also being made in this series. Each one takes you through your first half hour in that tool.

Check also:

This article was created with the help of artificial intelligence.